With 3,525.1 MWe installed power generation capacity Ghana has a power supply shortage. In 2016 a shortfall of 500MWe was reported. In order to overcome this shortage Clear Energy Ltd. intends to develop 200MWe Gas-Fired Power Plant and a 50MWe PV Solar Facility on the basis of a BOOT concept.

In 2018 Oomens Energy & Consulting conducted a pre-feasibility study to investigate the viability of different Gas-Fired Power Plant solutions, such as CCGT, SCGT and SC Gas Engines. The study revealed that high-efficiency, fuel flexible Simple Cycle (GT or Gas Engine) solutions, possible later on being converted into Combined Cycle, are of particular interest for the project.

 

Pre-Feasibility Study for Clear Energy Ltd.

23 February 2019